La Grande USFS Laboratory

GreenWorks prepared a site analysis to identify areas of security venerability for this important US Forest Service research laboratory, as well as areas needing improved access for people with disabilities. Following this, we developed a site improvement plan that addressed security and access improvements for the compound.  In addition to improving security, the project will also improve public contact, provide improved opportunities for community use of the lab, provide improved outdoor gathering and recreation space for employees, and decrease landscape maintenance by increasing the number of native plant species.

CONCEPTPLAN2SM.jpg

Hangzhou Canal

hz_2.jpg

GreenWorks as part of Team Oregon in collaboration with SOM, developed a Master Plan for the Historic Canal through Hangzhou, China.  The 1200-year-old canal flows over 100 miles north-south from Beijing to Hangzhou.  The canal will be redeveloped as a centerpiece of Hangzhou, celebrating the ecology, history and urban vitality of this historic city.  New stormwater facilities will be developed in each of four canal segments each with interpretive and recreational amenities to help cleanse and purify the water in the canal.

DSCN0046.JPG
DSCN0127.JPG

Cape Kiwanda Master Plan

With a multi-disciplinary team that includes GreenWorks, the project provides a sustainable blueprint to improve, locate, and develop tourism facilities and infrastructure within the Cape Kiwanda Focus Area. The goals were to create a framework for tourism facilities and infrastructure to protect the beauty and natural resource values; minimize and mitigate the adverse effects of visitors; improve the visitor experience; and attract and accommodate new visitors to the region. The team collaborated with over a dozen county, state and federal agencies, including Tillamook County Parks Department and Oregon Parks and Recreation Department, and hosted public information sessions with residents, businesses and community organizations to craft recommendations for improvements to existing infrastructure. Master plan work was completed in 2016.

2016_09_07_Study_Area.jpg

TriMet Light Rail Blue Line Station Improvements

TriMet’s MAX Light Rail system connects Portland, Gresham, Beaverton, Hillsboro and the Portland Airport. As a part of TriMet’s commitment to build and maintain a safe transit system, GreenWorks is assisting the agency in reviewing its existing lighting and access control design standards for the MAX stations. The overall goal is to create a safe and secure system of transportation for its patrons. Initially, this process will review, analyze, design, and implement prototype improvements to the existing lighting systems and access control at two eastside LRT platforms, both located on the TriMet Blue Line the stations of 82nd Avenue and Gresham Central. Design illumination and access control improvements will complement the existing architectural character of these two platforms. The improvements will be completed in coordination with internal and external stakeholders, and TriMet’s leadership review board. GreenWorks provided documentation of the site review of the two stations and a report including mapping of existing site conditions, an inventory of site elements, mapping of site opportunities and site constraints, an illumination assessment and light readings from the two stations. Building on this field research, our work included schematic design and construction documents. After implementation, our services will include a post occupancy analysis to inform the design analysis and may contribute to the modification of the TriMet Design Criteria.

trimet light rail system improvement project.jpg

Wilsonville SMART Operations Fleet Facility

GreenWorks provided landscape architectural services for the City of Wilsonville South Metro Area Regional Transit (SMART)  Operations Fleet Facility.  The project includes a 12,600 square foot Fleet and Administration Building located on an approximately 4.5 acre site. Site improvements include employee and bus parking, fleet maintenance, and administrative services, and is located on SW Boberg Road adjacent to the Wilsonville Westside Express Service (WES) Station.

Design services provided by GreenWorks, include Conceptual Site Design and Grading Coordination, type ‘C’ Tree Preservation and Removal Plans, and Final Construction Documentation. The design team developed a budget sensitive sustainable plan that embraces the natural characteristics of the site, and architectural design features. Habitat and buffering improvements integrated adjacent to the Significant Resource Overlay Zone (SROZ), provide a transition and embraced the landscape strategy of incorporating native and drought tolerant plants, in combination with a temporary irrigation system.  Stormwater is managed through on site conveyance in channels and basins, and is celebrated through roof rainwater capture and outfall at architectural scuppers along the building entrance.

DSC00887_reduced.jpg
DSC00931_reduced.jpg

TriMet Lightrail Station Redevelopment at Rockwood

GreenWorks provided conceptual planning and design for the redevelopment of TriMet’s Light Rail station at East 188th Street in the Rockwood neighborhood of Gresham, Oregon. A neighborhood in transition, Rockwood is part of Gresham’s first Urban Renewal Area. The 188th station in particular has the highest number of riders in the city. Station redesign focused on attracting redevelopment in the area through improvements to the 188th and East Burnside intersection, expanded access and capacity of the stations, pedestrian-oriented facilities, user safety, visibility and CPTED (Crime Prevention through Environmental Design) design. The station design exceeded the local stormwater requirements and incorporated infiltration planters adjacent to the platforms as a terminus for the platforms. The approved design incorporated significant redevelopment of the transit platforms, shelters, trackways, signage, landscape plantings and other features. Final presentation drawings and perspective sketches were prepared and presented to the Urban Renewal Commission.

RockwoodStation_ Looking East 2_reduced.jpg
rockwood_station_FMF7266_reduced.jpg

Sandy Public Works and Transit Operations Facility

GreenWorks, as part of a team, assisted the City of Sandy in the design of its new operations and maintenance facility which houses public works services and transit operations. The facility embraces sustainable design strategies by using a native plant palette and minimizing stormwater run off with a series of vegetated swales. Individual downspout features artistically accentuate the sheet flow activated by roof run-off. Our involvement included preliminary and final design for site improvements, overall grading and sustainable stormwater design solutions, low-maintenance landscape improvements, native planting design schemes and site screening for buffering requirements and hardscape design for public access locations.

Sandy OM1.JPG
Sandy_Operations.jpg

Bingen Downtown Revitalization

GreenWorks analyzed the downtown area of Bingen, Washington which is a small community in the Eastern Columbia River Gorge. It is a community which attracts tourists, recreationists and windsurfers in the Gorge. GreenWorks helped develop recommendations to revitalize the downtown core with streetscape improvements, pedestrian amenities and design of civic spaces. We compiled the analysis and recommendations in a comprehensive report which was used to seek funds for implementation.

Bingen.JPG
bingendone.JPG

Oregon City 7th Street Pedestrian Environment Improvements

DSC_0094.JPG

GreenWorks provided Schematic Design, Design Development, and Construction Drawings for this nine block commercial and residential district in Oregon City. The primary focus of this project was improving the pedestrian environment including street furniture, street trees, paving and public art. Neighborhood participation was a critical component. GreenWorks provided public involvement services and property owner coordination.

DSC_0105.JPG
DSC_0033.JPG
DSC_0096.JPG

Independence Downtown Revitalization

GreenWorks provided design coordination for the City of Independence Downtown Revitalization project. The challenge was to accommodate a high volume of traffic on Main Street, while enhancing the business and pedestrian corridor through downtown. By widening the sidewalks and providing curb extensions at intersections, the city was able to control vehicular traffic, and greatly improve a pedestrian friendly streetscape within the downtown core. Additional improvements included period street furniture, historic lighting with planted hanging baskets, and accent trees.

Independence Downtown.JPG
historic_independence_july4th_parade.JPG

Gresham Main Street

DSC_0242.JPG

GreenWorks developed concept plans and working drawings for pedestrian improvements related to a street renovation project in downtown Gresham. The project required citizen involvement meetings and coordination with utility companies and state officials. Pedestrian improvements were applied to five “core” downtown blocks including; bomanite crosswalks, new sidewalks of patterned concrete, street trees, benches, litter receptacles, and ornamental street lights. Considerable design time was spent evaluating various alternatives for streetscape layout. Reference: City of Gresham.

DSC_0236.JPG
DSC_0238.JPG
Gresh_main_c_plan_reduced.jpg

Boones Ferry Road

GreenWorks worked alongside HNTB Corporation and the City of Lake Oswego to develop an innovative streetscape and green infrastructure strategy as part of the Phase 2 Boones Ferry Road Improvement Project. Using the scope at hand, the design team identified multiple green street strategies and concepts from successful similar projects, ultimately concluding a center median based treatment concept would best manage stormwater runoff from the roadway and sidewalks.  The overall character of the streetscape has been designed to support the vision set forth in the Lake Grove Village Center Plan to reflect the natural beauty of the surrounding evergreen forest.

110171__BoonesFerry_Urban Design Concept Book_layout 12.jpg
110171_BoonesFerryRoad_reduced.jpg

Damascus Green Street Concepts

Local+GRN.jpg

Assisting the City of Damascus, GreenWorks recommended strategies using a system approach to meet the needs for parks and open space services while maximizing the preservation of natural areas, enhancing ecosystem services, and creating a sense of place. GreenWorks developed a preferred level of service approach with the quantity and quality of facility capacity that would determine the basis for developing and justifying specific capital improvements projects, the recommended level of service standards, and financing plans for each type of capital facility. The eco system service approach to the Public Facilities plan is a first for a municipality in the State of Oregon to consider how public facilities planning can effectively consider its natural resources as an economic and natural resources for the city and its residents. GreenWorks’ parks system planning efforts identify strategies for incorporating eco system services and the public infrastructure for a sustainable parks planning foundation.

damascus_greenstreetconcepts.jpg

Pringle Creek Community Pervious Pavement

This sustainable housing and mixed-use, 32-acre project spearheaded the redevelopment of the 275-acre former Fairview Training Center site in southeast Salem. The project incorporates sustainable design concepts for both the building types and the public infrastructure. As part of an interdisciplinary team, GreenWorks implemented a wide range of project objectives related to sustainable site design.  GreenWorks  design responsibilities included: collaboration on design of green streets and rain gardens; public recreational spaces; the Village Green open space; pedestrian / pathway  network; woonerfs; greenway enhancement; and overall landscape treatment.  The project was awarded the Land Development of the Year Award in 2007 from the National Home Builder’s Association.

IMG_6113.JPG
DSC_0182 - Copy.JPG
DSC_0188.JPG

Tualatin Nyberg Interchange (Interstate 5)

GreenWorks created a master plan for the interior Interstate 5 corridor through the City of Tualatin. The first phase of this involved a comprehensive opportunities and constraints analysis, that identified target areas and potential scope of improvements throughout the corridor. This led to the design of a master plan that provides the conceptual view of long-term and short-term landscape improvements, as well as potential costs. The master plan was approved by Tualatin, as well as regional ODOT staff for compliance to recommended plant species and overall maintenance regimes. The master plan provides guidance for future landscape improvements, opportunities for public-private partnerships, and overall consistency of subsequent projects.

The second phase involves the development of a more detailed design of landscape improvements for the Nyberg Road Interchange (phase one). This expansive interchange is currently underutilized and offers the opportunity to become the visible gateway to the City of Tualatin. Design challenges involved working with ODOT for maintenance access and planting apporpriateness made easy through pre-review of the master plan in the first project phase. Since the majority of users for the interchange are in fast traveling vehicles, we developed 3D modeling and photomontage design solutions to represent the user experience at speed. This greatly improved the overall communication of design intent. After developing and refining a number of possible solutions with the project team, including Tualatin and review by ODOT, a preferred alternative was created, and construction documents were prepared.

_DSC5334_reduced.jpg
Nyberg_Birdseye_reduced.jpg
Nyberg2.jpg
Nyberg3.jpg

Washington Way Bridge

The Washington Way Bridge replacement project replaced an existing 66 foot wide, five-lane, timber-structure bridge that spans 160 feet, crossing over Lake Sacajawea in Longview’s historic Lake Sacajawea Park. GreenWorks worked with a team of engineers to provide architectural design input for a new concrete bridge that complements the historic character of the park and meets better safety needs with wider sidewalks and enhanced lighting. GreenWorks also provided architectural renderings of the proposed bridge design and additional graphic support for two public open houses to solicit public input. Architectural elements considered in the design of the bridge included railing design, layout of ornamental lighting, bridge materials and finishes, and bridge span and pier types. Planting design of the landscape adjacent to the new bridge included plant and tree species consistent within the context of Lake Sacajawea Park.

IMG_1995_reduced.jpg
Washington-Way-Bridge-Sequence_reduced.jpg

Oregon Zoo Stormwater Retrofit

GreenWorks developed a Stormwater Retrofit Master Plan for the Oregon Zoo at the request of the Portland Bureau of Environmental Services in partnership with the Oregon Zoo. The Oregon Zoo is one of Oregon’s top tourist attractions and is ideally suited for public education related to environmentally-responsible and sustainable site design. Subsequently, GreenWorks was contracted by METRO to implement parking lot and Greenstreet improvements, at this major tourist attraction, to treat and detain surface runoff, provides public education and creates aesthetic improvements. GreenWorks was part of a design / build team to implement strategies that included stormwater filtration for street runoff and flow-through stormwater planters for parking lot runoff treatment. The project was funded by an EPA grant.

After.JPG

Gabriel Park Water Quality Project

The Fanno Creek watershed is heavily impacted by urbanization. Urban streams are suffering from increasing impervious surfacing that results in increased runoff and higher stream velocities. Gabriel Park is symptomatic of these factors: swales have become unsafe gullies; forest groundcover vegetation is absent; park lawns have become severely compacted through overuse and provide little infiltration. The Vermont Tributary of Fanno Creek, which runs through the park has been severely impacted by those factors. GreenWorks developed several concepts to improve water quality for surface runoff in the park and presented these to three neighborhood groups. We provided schematic designs for various stormwater mitigation options, including: a wet pond/marsh treatment system; forest ground-floor revegetation; biofiltration swales; and creation of a wet meadow. GreenWorks provided final design and bidding documents.

_DSC1334_reduced.jpg

Clackamas Head Start Facilities

GreenWorks developed a Site Master Plan for the new Head Start Facilities in Clackamas County. Through creative treatment and handling of stormwater the Playground and Outdoor Courtyard Classroom on site create learning opportunities related to water and the environment. The Playground features a variety of outdoor activities for active play and discovery, including a play structure, tricycle track, and fossil themed sand box. The nature trail, along with raised garden beds, provides lessons in science, observation and stewardship. The Outdoor Classroom, or courtyard, focuses on connecting students with the physical properties of the water cycle; falling rain, run off as stormwater, evaporation, and transpiration. The courtyard is a place of dynamic activity highly influenced by the environment, the sun and the rain, and easily visible to students from inside the building.

11x17master+plan_1.31.06.jpg

Willamette Stormwater Control Pilot Program

GreenWorks was contracted by the Portland Bureau of Environmental Services to develop hand –illustrations of various stormwater facilities for a variety of Bureau uses. The illustrations included parking lot swales/infiltration facilities, courtyard infiltration facilities, rooftop disconnect infiltration facilities, and stormwater planters.

BES_parkinggravel.jpg